{"id":9128,"date":"2026-04-22T11:58:31","date_gmt":"2026-04-22T11:58:31","guid":{"rendered":"https:\/\/comcereal.ro\/?p=9128"},"modified":"2026-05-05T03:20:42","modified_gmt":"2026-05-05T03:20:42","slug":"instalare-centrala-electrica-fotovoltaica-in-sat-padureni-in-cadrul-comcereal-sa","status":"publish","type":"post","link":"https:\/\/comcereal.ro\/en\/instalare-centrala-electrica-fotovoltaica-in-sat-padureni-in-cadrul-comcereal-sa\/","title":{"rendered":"Instalare central\u0103 electric\u0103 fotovoltaic\u0103 \u00een sat P\u0103dureni \u00een cadrul Comcereal SA"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"9128\" class=\"elementor elementor-9128\">\n\t\t\t\t<div class=\"elementor-element elementor-element-822a526 e-flex e-con-boxed e-con e-parent\" data-id=\"822a526\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f74e681 elementor-widget elementor-widget-html\" data-id=\"f74e681\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t\t<h2>Comunicat de pres\u0103<\/h2>\r\n\r\n<p><strong>COMCEREAL S.A.<\/strong> anun\u021b\u0103 semnarea contractului de finan\u021bare nr. <strong>CFMSES011011424100140<\/strong> din <strong>12.11.2025<\/strong> pentru proiectul <strong>\u201eINSTALARE CENTRALA ELECTRICA FOTOVOLTAICA IN SAT PADURENI IN CADRUL COMCEREAL S.A.\u201d<\/strong>, depus \u00een cadrul Fondului pentru Modernizare \u2013 Schemei de ajutor de stat privind sprijinirea investi\u021biilor \u00een noi capacit\u0103\u021bi de producere a energiei electrice din surse regenerabile pentru autoconsumul \u00eentreprinderilor din cadrul sectorului agricol \u0219i industriei alimentare.<\/p>\r\n\r\n<p>Valoarea total\u0103 a proiectului este de <strong>290.215 RON<\/strong>, din care sprijinul financiar nerambursabil este de <strong>217.590,80 RON<\/strong>.<\/p>\r\n\r\n<p>Proiectul se implementeaz\u0103 \u00een perioada <strong>12.11.2025 \u2013 11.11.2026<\/strong> \u00een <strong>P\u0103dureni, jude\u021bul Vrancea, Tarlaua 38, Parcela 150, cl\u0103direa C22<\/strong>.<\/p>\r\n\r\n<p>Data de finalizare a proiectului este <strong>11.11.2026<\/strong>.<\/p>\r\n\r\n<p>Obiectul acestei investi\u021bii \u00eel constituie construirea unei Centrale Electrice Fotovoltaice \u00een localitatea P\u0103dureni, jude\u021bul Vrancea, cu o putere instalat\u0103 de <strong>0.095 MW<\/strong>, cu stocare de <strong>20.7 kWh<\/strong>, pentru reducerea cheltuielilor cu energia electric\u0103, injectarea surplusului de energie verde \u00een SEN, dar \u0219i pentru protec\u021bia mediului prin diminuarea emisiilor de dioxid de carbon.<\/p>\r\n\r\n<p>Obiectivul general al proiectului va fi atins prin \u00eendeplinirea urm\u0103toarelor obiective specifice:<\/p>\r\n\r\n<ol>\r\n  <li>Reducerea cantit\u0103\u021bii de energie electric\u0103 achizi\u021bionat\u0103 din SEN cu <strong>101.33 MWh\/an<\/strong> pentru asigurarea desf\u0103\u0219ur\u0103rii procesului tehnologic;<\/li>\r\n  <li>Reducerea impactului asupra mediului cu <strong>62.03 tone CO2\/an<\/strong>, cuantificat prin amprenta de CO2 echivalent;<\/li>\r\n  <li>Cre\u0219terea num\u0103rului \u0219i puterii instalate a instala\u021biilor de producere de energie electric\u0103 verde cu o unitate de produc\u021bie;<\/li>\r\n  <li>Asigurarea unei dezvolt\u0103ri durabile a societ\u0103\u021bii prin reducerea cheltuielilor cu energia cu aproximativ <strong>1,920,877.92 lei<\/strong> pe \u00eentreaga perioad\u0103 de analiz\u0103 \u0219i, respectiv, cu un cost mediu de <strong>96,043.90 lei\/an<\/strong>.<\/li>\r\n<\/ol>\r\n\r\n<p><strong>Date de contact:<\/strong><br>\r\nGelu Scutaru \u2013 Reprezentant legal<br>\r\nAdresa de e-mail: <a href=\"mailto:comcereal@comcereal.ro\">comcereal@comcereal.ro<\/a><br>\r\nNum\u0103r de telefon: 0372 714 502<\/p>\r\n\r\n<p><em>Finan\u021bat prin Fondul pentru Modernizare<\/em><\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Comunicat de pres\u0103 COMCEREAL S.A. anun\u021b\u0103 semnarea contractului de finan\u021bare nr. CFMSES011011424100140 din 12.11.2025 pentru proiectul \u201eINSTALARE CENTRALA ELECTRICA FOTOVOLTAICA<\/p>","protected":false},"author":1,"featured_media":9129,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[46],"tags":[],"class_list":["post-9128","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicat-de-presa"],"_links":{"self":[{"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/posts\/9128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/comments?post=9128"}],"version-history":[{"count":4,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/posts\/9128\/revisions"}],"predecessor-version":[{"id":9133,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/posts\/9128\/revisions\/9133"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/media\/9129"}],"wp:attachment":[{"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/media?parent=9128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/categories?post=9128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/comcereal.ro\/en\/wp-json\/wp\/v2\/tags?post=9128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}